M&T systems are ideally designed to be as simple to install as possible.
Click on the corresponding link below to download the appropriate installation instructions
for your chosen system.

Easy to install

M&T Plastiek

installation instructions

Generally for boreholes where waterlevels are at 45m or less. The 45m system consist of a springloaded footvalve, plunger & t-piece.

Generally for boreholes where waterlevels are at 45m or more. The 60m system consist of a springloaded footvalve , plunger & t-piece plus an extra plunger which is inserted halfway to the top to spread the weight of the water as it moves to the surface.

The force head is generally used when water needs to be transferred to a location not directly next to the borehole. Inserted near the very top at the rod, it forces water to the location of your choice, lifting it up to 10 meters over 1 kilometer.

M&T Plastiek | Installation

installation video

Click on the video below to view the installation process and instructions.